Construction Photos
Some photos of a 2014 Bahia 23 under construction. Not all steps can be shown. All clients are welcome to tour the shop and be a part of the build process for their boat. We ask that only pictures we approve of be shown to the public.


 
Image

Spraying Gelcoat.


 
Image

White Bottom 2 color hull.


 
Image
P
First layer of laminates.


Image

Vacuum bagged core.


 
Image

Core Clamped.


 
Image

Porta Bracket Install.


Image

Laying up the console.


 
Image

Hull going on to the roller.


 
Image

Ready for cap install.


Image

Installing the Rub Rail.


 
Image

Testing the LED Lights.


 
Image

Vacuum Bag for the Hard Top Core.


Click image for close-up view



image